Owner: CINQPLAST PLASTOP
Client: Synergy Construction Group Pty Ltd
Engineer: MEC
Architect: Micheal Fountain Architects Pty Ltd
Project Description: The installation of a new runway for a new 3 tonne gantry crane and packaging room. The new runway beams and enclosure for the packaging room were retro-fitted within an existing warehouse. The new steel columns are supported by screw piles installed through the existing floor slab.